Since January 2022, the City of Austin has issued 15,023 building permits for remodels, additions and repairs on houses and duplexes inside city limits. As of October 28, 2026, 11,689 of them are finalized. 2,614 are marked Expired, which means the permit ran out before the city recorded a passing final inspection. That is 17.4 percent, or about one in six.
A lapsed permit is not a finding that the work is bad. It means the paper trail stops. The City's rule is that the property owner is responsible for an expired permit "even if they did not own the property at the time the permit was issued." If you are about to buy an Austin house, that sentence is why this record is worth ten minutes before you write an offer.
What happened to the permits
We counted every Building Permit in the City's residential remodel and repair classes (R-434 Addition and Alterations and R-435 Renovations/Remodel) issued inside Austin full-purpose city limits from January 1, 2022 through December 31, 2025, and tallied each permit's status as the City shows it today.
| Status | Permits | Share |
|---|---|---|
| Final | 11,689 | 77.8% |
| Expired | 2,614 | 17.4% |
| Active | 368 | 2.4% |
| Withdrawn | 299 | 2.0% |
| Void, pending, on hold or cancelled | 53 | 0.4% |
| Total | 15,023 | 100% |
Source: Austin Local Team analysis of City of Austin issued construction permit records, status as of Oct. 28, 2026, pulled Oct. 29, 2026. Shares are our arithmetic and are rounded.
The 2,614 expired permits sit at 2,537 different street addresses, so most of these are one lapsed permit at one house. Seventy-three addresses have more than one.
Older permits have had longer to lapse
Every expired permit in this set had an expiration date at least 180 days after its issue date, and the typical one was 180 to 185. So the year a permit was issued matters, because owners can finish the paperwork later and recent permits have had less time to run out.
| Issued in | Permits | Expired | Share expired |
|---|---|---|---|
| 2022 | 4,170 | 922 | 22.1% |
| 2023 | 3,800 | 738 | 19.4% |
| 2024 | 3,418 | 486 | 14.2% |
| 2025 | 3,635 | 468 | 12.9% |
Source: same City records and pull date as above. We do not read the falling shares as improvement; the 2025 permits are younger and may still change status.
The takeaway for a buyer is simple. A permit from 2022 that is still Expired in late 2026 has not fixed itself, and nothing in the record says it will.
Which jobs lapse most
The most common jobs on this list are the quick ones. The City runs Express Permits for small residential repairs: window replacement "size for size," and foundation repair "without increasing impervious cover in excess of 128 sq. ft." The City says most Express Permits issue in one business day. They are fast to get, and the inspection is still the owner's or contractor's job to schedule. The permit page says that after posting the permit, "the next steps are for completing your required inspections."
| Description mentions | Permits | Expired | Share expired |
|---|---|---|---|
| Windows | 5,368 | 994 | 18.5% |
| Foundation | 2,481 | 456 | 18.4% |
| Other jobs labeled Express | 2,903 | 734 | 25.3% |
| Everything else | 4,271 | 430 | 10.1% |
Source: same City records and pull date as above. Jobs are sorted by the words in the permit description, so a permit that mentions both windows and a foundation is counted under windows. Descriptions are typed by applicants and are not a standard category.
Express-type jobs lapse at roughly twice the rate of everything else. We cannot tell from the records why. A short, cheap permit may be easy to forget once the work is done, but the file does not say so, and we are not guessing at anyone's reasons. Our piece on foundation repair permits covers how many were issued this year.
How a permit expires
The City's homeowner permit page says that once a permit is activated, "it expires on the 181st day if the project has not been scheduled nor received an inspection." A canceled or failed inspection does not extend the date, and a passing inspection extends it by 180 days. The page adds that "an expired permit may be required to be addressed before issuing new permits."
The City's Modify a Permit page covers the fix. The property owner, the general contractor or the trade contractor on the permit can request that an expired permit be reactivated, and "fees are required for the reactivation request." The page also says an extension can be requested only one time for each permit.
If you later want a new permit on the same property, the City's residential plan review page tells you to check Public Search for expired permits first, and if there are any, to submit an Acknowledgment of Expired Permits with your application.
What this means if you're buying or selling here
Buying. Search the address in the City's Public Search before you are committed to the house, and during your option period if your contract has one. Enter the property address and a wide date range, then read the status of each permit. Final is the clean answer. Expired or Active on a job that looks finished (new windows, a repaired foundation, a bathroom) is a question for the seller, and it is cheaper to ask before closing than after. Texas Real Estate Commission form OP-H, the Seller's Disclosure Notice (version 09-01-2019), asks in item 9 whether the seller is aware of "room additions, structural modifications, or other alterations or repairs made without necessary permits or not in compliance with building codes in effect at that time." A permit record is a fact you can compare against that answer.
Selling. Look up your own address before you list. If a job you paid for shows Expired, the City says the owner carries it, and a reactivation request has fees and a process, so it is better to know in week one than in week three of a contract. Keep the final inspection record for any repair in one folder with the receipts.
Owning. If you are planning a new project, an old lapsed permit at the address may need to be dealt with first, per the City's plan review guidance above.
For a ruling on a specific permit, call or book with City of Austin Development Services. For legal or lending questions about a contract, ask an attorney or lender. This article is general education about public records, not advice about any house.
How we counted
We used our synced copy of the City of Austin issued construction permits (data.austintexas.gov), filtered to permit type Building Permit, classes R-434 and R-435, jurisdiction "Austin full purpose," issue date January 1, 2022 through December 31, 2025. Status is the value in the file on October 28, 2026, the newest status date at our pull. This leaves out the City's two-mile ETJ and limited-purpose areas, plumbing, electrical and mechanical permits, and new construction. An address can hold several permits, so we counted addresses separately where we say so. Because we cannot see inspections that happened but were never recorded, Expired means only what the City's record says.
To read the full permit history of one address, our sister research site Zabalist has a permit-history search by address. Our Austin home research tool adds flood zone and geology for an address. Earlier this month we looked at remodel and addition permits and, last week, what pre-1978 houses must disclose.
If you are looking at an Austin house and want someone to read its permit history with you before you make an offer, talk to a local agent on our team.