The City of Austin permitted 31,416 new houses from 2000 through 2012 that later passed their final inspection. For 23,308 of them, or 74%, the City's records show no permit to replace the central heating and air system since. Not one.
That does not mean three in four of those houses still run on the system the builder put in. Some owners replaced theirs without a permit, and the record cannot tell you which. What it does tell a buyer is simple: on most Austin houses of that age, the paperwork will not answer the question you care about in July, which is how old the AC is. You have to answer it another way, and the time to do that is the option period, not the first heat wave.
Here is what the City's permit record shows, what it leaves out, and the four checks that fill the gap.
Most houses from the 2000s have no change-out on record
| Year the house permit was issued | Houses | With a change-out permit | No change-out on record | Share with none |
|---|---|---|---|---|
| 2000 to 2004 | 13,157 | 4,323 | 8,834 | 67% |
| 2005 to 2008 | 12,565 | 2,861 | 9,704 | 77% |
| 2009 to 2012 | 5,694 | 924 | 4,770 | 84% |
| All, 2000 to 2012 | 31,416 | 8,108 | 23,308 | 74% |
The pattern runs the way you would expect: the older the house, the more likely someone has pulled a change-out permit. Even so, two in three houses permitted from 2000 to 2004, now 22 to 26 years past their first permit, show none.
A house that does have a permit on file is not automatically in the clear either. Across all Austin parcels with a finished change-out on record, 52,597 in all, the most recent one dates to 2010 or earlier at 6,415 of them. That is about one in eight. Those systems are at least 15 years old if nothing has been swapped since.
About 4,000 to 5,000 change-outs a year, and one in five never closed
The City files an HVAC replacement as a residential mechanical permit with the work class "Change Out." The standard description on almost every one reads "Replacement of complete existing central heat and air system with or without duct work." Here is how many the City has recorded each year, by application date, and where they stand today.
| Year applied | Permits | Final | Expired | Share expired |
|---|---|---|---|---|
| 2015 | 3,798 | 3,254 | 542 | 14% |
| 2016 | 3,883 | 3,220 | 660 | 17% |
| 2017 | 4,563 | 3,607 | 952 | 21% |
| 2018 | 4,710 | 3,781 | 927 | 20% |
| 2019 | 4,762 | 3,832 | 923 | 19% |
| 2020 | 4,728 | 3,519 | 1,199 | 25% |
| 2021 | 5,200 | 4,040 | 1,150 | 22% |
| 2022 | 5,238 | 4,217 | 1,013 | 19% |
| 2023 | 4,651 | 3,719 | 923 | 20% |
| 2024 | 4,413 | 3,073 | 1,320 | 30% |
| 2025 | 3,994 | 3,220 | 752 | 19% |
| 2026 (to Nov. 11) | 3,908 | 2,489 | 223 | too early |
From 2015 through 2025 the City recorded 49,940 change-out permits, and 10,361 of them are marked Expired. That is 21%. The worst year was 2024: 1,320 of 4,413, or 30%. We checked the City's own open-data feed for 2024 and it shows the same 3,073 Final and 1,320 Expired.
Expired means the permit ran out before the City recorded a passing final inspection. It is not a finding that the installation is unsafe. Often the new unit went in and nobody called for the last inspection. But the City's modify a permit page is plain about who carries it afterward: "The property owner is responsible for any expired permits on the property," even if they did not own the property when the permit was issued. Reactivating one takes a request from the owner or a contractor on the permit, and a fee. The same page says an expired permit "may need to be resolved before issuing any new permits."
Most expired change-outs are never cleaned up by a later one. Of the 10,355 expired permits from 2015 to 2025 that we could tie to a parcel, only 924, about 9%, are followed by a later change-out at the same parcel that did reach Final.
This year is running a little ahead of last. Counting permits that are Final, Expired or Active, the City has 3,904 change-out applications dated January 1 through November 11, against 3,597 for the same dates in 2025, up 9%. The same window in 2022 had 4,792.
June brings 2.4 times as many swaps as January
Replacements follow the heat. Over 2015 through 2025, June accounts for 6,119 change-out applications and January for 2,517. May through September together hold 55% of the year's permits. November through February hold 21%.
For a buyer, that seasonality cuts two ways. A house that goes under contract in November gives you an inspection in mild weather, when a tired system has nothing to prove. And if you do need to replace it, the slow months are when contractors have the most room on their calendars.
The rules behind the record
- The City permit. The City lists "Plumbing and Mechanical: Change Out" among its stand-alone permits on its apply for a standalone permit page, filed through the Austin Build + Connect portal. That page says a mechanical permit "must be requested by the registered mechanical contractor who will be assigned to the permit." A homeowner can apply only after registering under the City's homestead permit rules.
- The contractor's license. Air conditioning and refrigeration contractors in Texas are licensed by the Texas Department of Licensing and Regulation. You can look one up from TDLR's air conditioning and refrigeration contractors page.
- The refrigerant. The EPA's phaseout schedule ended production and import of HCFC-22, the refrigerant known as R-22, on January 1, 2010, except for equipment made before that date, and ended it entirely on January 1, 2020. A system installed in an Austin house before 2010 may still run on it. Under the EPA's current technology transitions tables, new residential split systems have been held to a refrigerant global warming potential limit of 700 since January 1, 2025, and a system whose components were all made before that date has no installation deadline. Ask the inspector or an HVAC contractor which refrigerant a system uses; it bears on what a repair costs.
- The seller's disclosure. The Texas Real Estate Commission's Seller's Disclosure Notice (form 55-1, effective May 28, 2026) lists central A/C and central heating among the items a seller reports on, and asks whether the seller is aware of "alterations or repairs made without necessary permits or not in compliance with building codes in effect at that time."
Four checks that date the system before your option period ends
- Pull the permit history. Search the address in the City's Austin Build + Connect portal or on Zabalist's permit lookup, and look for a mechanical permit with the work class Change Out. Final is what you want to see. Expired, or no permit at all on a house more than about 15 years old, is a reason to ask questions, not a verdict.
- Read the data plate. The outdoor condenser and the indoor unit each carry a manufacturer's label with a model and serial number. Most manufacturers encode the build date in the serial number, and your inspector or an HVAC contractor can decode it. If the condenser and the indoor unit were made years apart, one was replaced without the other.
- Ask for the energy audit. Inside Austin city limits and Austin Energy's service area, the City's Energy Conservation Audit and Disclosure ordinance requires the seller of a home at least 10 years old to have an energy audit and give the results to the buyer, unless an exemption applies. Austin Energy's ECAD page for sellers says the audit covers heating and cooling equipment efficiency, age and condition, plus ducts and attic insulation, and that results are due "at least three days before the end of the option period," or at contract signing if there is no option period. An audit is good for 10 years, so the one you get may be older than the system, or the system may be newer than the audit. Austin Energy also runs a compliance status lookup by address.
- Have it inspected, then compare. A licensed home inspector reports on the heating and cooling equipment. Put the permit date, the data plate date and the audit side by side. When they agree, you know what you are buying. When they do not, you have a specific question for the seller while you can still act on it.
What this means if you're buying, selling or renting here
- Buying. Treat the AC's age as something you establish, not something you assume. If the record and the data plate point to an original system on a house from the 2000s, factor that into your inspection questions and your budget, and talk to your agent about how to handle it inside your contract. Our earlier piece on expired home permits covers what an expired permit can mean for a closing.
- Selling. Look up your own address before you list. If a change-out shows Expired, ask the contractor who installed it to reactivate the permit and call in the final inspection. That is usually easier before a buyer's inspector finds it. If you have the install invoice or the warranty registration, put it in the disclosure packet. Your ECAD audit, if it is more than a few years old, may describe a system you have since replaced.
- Renting. Ask the landlord in writing who handles AC repairs, how fast, and what happens if the system fails in August. Read what the lease says about it before you sign.
None of this is a claim about what a new or old system does to a home's price, and no permit count can tell you how long a particular unit will last. For a decision about a specific house, a licensed inspector, an HVAC contractor or your agent is the right person to ask.
Where to look next
- A permit check for a different system: foundation repair permits in Austin.
- Last Sunday's record: pool permits, and why one in six older ones expired.
- Flood, tax and parcel context for a specific address: our address research tool.
- The City's own dataset, Issued Construction Permits, if you want to check our counts.
How we pulled this
We counted City of Austin residential mechanical permits (type MP, permit class Residential, work class Change Out) in the Zabalist research database, which mirrors the City's Issued Construction Permits dataset. Each permit number is counted once, by application date. Void, withdrawn and cancelled permits are left out. Status is as of the sync time in the captions. We re-ran the 2024 status counts against the City's open-data feed (last updated November 17, 2026) and they matched exactly. For the first table, we took new-house building permits (class R-101, work class New) marked Final and issued 2000 through 2012, kept the earliest one per appraisal parcel, and checked whether that parcel has any change-out permit marked Final, Expired or Active. A parcel with more than one home, such as a duplex, counts once. The "later Final" check matches on parcel. These are City of Austin records only, so houses in Round Rock, Pflugerville, Cedar Park, Bee Cave, other cities and unincorporated areas are not counted. Change-outs filed under a remodel or addition permit are not counted, so the share with no change-out on record is an upper bound. A permit is an authorization; this data does not show the age or condition of any particular system. Percentages are our arithmetic. This is a count of public records, not a market statistic.
One next step
If you are weighing a specific Austin house, talk to a local Austin Local Team agent and ask for the address's permit history before your option period starts.